Road Maintenance Phase 2 - Al-Mahalah to Stadium
Construction of a 4.5 km dual carriageway including excavation, asphalt, sliding curbs, and flood drainage constructions.

Specifications
Project Number
19/007/001/30010402/22424
Entity
Asir Municipality
Executed Work
Earthworks, Asphalt, & Flood Drainage
Project Details
Traffic Safety Improvement (Northern Municipality)
Project Overview
This project represents a critical initiative by the Riyadh Municipality (Project No. 2022/273) to modernize and secure the road infrastructure within the Northern Municipality district. The primary objective is to reduce traffic accidents and improve the navigational experience for both motorists and pedestrians through high-standard engineering solutions.
Scope of Work
High-Visibility Road Markings: Application of thermal plastic and cold-plastic painting for lane dividers, edge lines, and stop bars to ensure maximum visibility under all weather conditions.
Pedestrian Safety Zones: Implementation of clearly defined zebra crossings and school zone markings using anti-skid materials.
Traffic Guidance Systems: Installation of directional arrows and regulatory symbols to streamline traffic flow at major intersections and roundabouts.
Reflective Safety Features: Integration of reflective studs (cat-eyes) to enhance nighttime road boundary definition.
Impact
By raising the standards of traffic safety, this project contributes to the "Quality of Life" goals of Saudi Vision 2030, ensuring that the Northern Riyadh district remains a safe environment for its rapidly growing population.

Have a Similar Project?
We are here to help you execute your vision with the highest standards of quality and safety. Contact us today for a free consultation.
Explore More



