ISO CertificationsSafety Triangle Logo

Road Maintenance Phase 2 - Al-Mahalah to Stadium

Construction of a 4.5 km dual carriageway including excavation, asphalt, sliding curbs, and flood drainage constructions.

صيانة الطرق المرحلة الثانية - من دوار المحالة إلى الاستاد

Specifications

Project Number

19/007/001/30010402/22424

Entity

Asir Municipality

Executed Work

Earthworks, Asphalt, & Flood Drainage

Project Details

Traffic Safety Improvement (Northern Municipality)

Project Overview

This project represents a critical initiative by the Riyadh Municipality (Project No. 2022/273) to modernize and secure the road infrastructure within the Northern Municipality district. The primary objective is to reduce traffic accidents and improve the navigational experience for both motorists and pedestrians through high-standard engineering solutions.

Scope of Work

  • High-Visibility Road Markings: Application of thermal plastic and cold-plastic painting for lane dividers, edge lines, and stop bars to ensure maximum visibility under all weather conditions.

  • Pedestrian Safety Zones: Implementation of clearly defined zebra crossings and school zone markings using anti-skid materials.

  • Traffic Guidance Systems: Installation of directional arrows and regulatory symbols to streamline traffic flow at major intersections and roundabouts.

  • Reflective Safety Features: Integration of reflective studs (cat-eyes) to enhance nighttime road boundary definition.

Impact

By raising the standards of traffic safety, this project contributes to the "Quality of Life" goals of Saudi Vision 2030, ensuring that the Northern Riyadh district remains a safe environment for its rapidly growing population.

صيانة الطرق المرحلة الثانية - من دوار المحالة إلى الاستاد

Have a Similar Project?

We are here to help you execute your vision with the highest standards of quality and safety. Contact us today for a free consultation.